10

Tonnes of Material

621

Parts

16

Assemblies

The Project Outline

A 24m long, fully welded, drop in service pit was required to service & brake test trucks at JJ Richards. Precise Digital Construction assisted by providing a 3D model to help with the mechanical design before providing final detail drawings for fabrication.

Location
Brisbane,
QLD
Requirements
  • Platework
  • Ladder
  • Stair
Year

2020