10
Tonnes of Material
621
Parts
16
Assemblies
The Project Outline
A 24m long, fully welded, drop in service pit was required to service & brake test trucks at JJ Richards. Precise Digital Construction assisted by providing a 3D model to help with the mechanical design before providing final detail drawings for fabrication.
Location
Brisbane,
QLD
QLD
Requirements
- Platework
- Ladder
- Stair
Year
2020