27
Tonnes of Material
1545
Parts
220
Assemblies
The Project Outline
The recent upgrade of the Pacific Motorway, from Underwood to Mt Gravatt, consisted of multiple cantilevering & overhead gantries which Precise Digital Construction provided drafting for all.
The largest of these gantries was the 13S, spaning 25m & over 11m tall. With a 50mm precamber accurately 3D modelled so that the final fit up was as smooth as possible.
Location
Pacific Motorway,
QLD
QLD
Member Types
- Columns
- Welded Trusses
- Welded Frames
Year
2019