27

Tonnes of Material

1545

Parts

220

Assemblies

The Project Outline

The recent upgrade of the Pacific Motorway, from Underwood to Mt Gravatt, consisted of multiple cantilevering & overhead gantries which Precise Digital Construction provided drafting for all.

The largest of these gantries was the 13S, spaning 25m & over 11m tall. With a 50mm precamber accurately 3D modelled so that the final fit up was as smooth as possible.

Location
Pacific Motorway,
QLD
Member Types
  • Columns
  • Welded Trusses
  • Welded Frames
Year

2019