14.5

Tonnes of Material

2451

Parts

212

Assemblies

The Project Outline

Working with one of our local fabricators we were able to provide steel detailing and design solutions for this distribution channel.

With site coordination relayed to make some final adjustments the pipe clamps and new stairs connecting to exiting structures install was completed and without any re-work.

Location
Pinkenba,
QLD
Member Types
  • Pipe Clamps
  • Handrails
  • Grating
  • Fully Welded Frames
Year

2019