80

Tonnage

1568

Assemblies

2234

Parts

The Project Outline

We flew down to Melbourne the week before we commenced this project to collect survey data using our Trimble X7, on the day we were able to complete over 30 scans onsite to piece together our point cloud data required to begin the steel detailing. Working closely with the architects and engineers on this one due to the shape of the structure encroaching on the boundary we had a few challenges along the way however we were able to overcome these and incorporate all design aspects to the consultants’ requirements.

Location
Victoria

Brighton

Services Provided
  • Steel Detailing
  • 3D Laser Scanning
  • Assembly & Part Drawings
  • Marking Plans
  • Clash Detection
  • NC Data
Project Type
  • Government
Year

2022