50

Tonnes of Material

2790

Parts

994

Assemblies

The Project Outline

The ANI or Australian Naval Infrastructure Office commenced building in February 2021 to bring ANI personnel together in a central location within the shipyard precinct.

Precise DC was appointed the task of steel detailing and coordination with Precast detailing to ensure fitment and installation dates where met, we were able to provide both of these along with standard inclusions exported from Tekla Structures including Marking plans & fabrication drawings plus 3d Models to conduct clash checks with the model.

Location
South Australia

Adelaide

Services Provided
  • Steel Detailing
  • BIM Coordination
  • Marking Plans
  • Fabrication shop drawings
  • NC Data
  • 3D Model
Project Type
Government
Year

June 2021