222

Tonnage

11200

Assemblies

42222

Parts

The Project Outline

The proposed $14.5 million bridge will be built across the O’Keefe Street intersection near Buranda train station, using a loop bridge structure to connect O’Keefe Street to Regent Street. The new bridge will make it quicker and safer to ride into the CBD. The velobridge will benefit bike riders and motorists by reducing pauses in traffic flow that currently occur when bike riders cross these streets. Precise DC took pleasure in providing steel detailing services to our local client who specializes with such projects and fabrication.

Location
Queensland

Brisbane

Services Provided
  • Steel Detailing
  • Assembly & Part Drawings
  • Marking Plans
  • Clash Detection
  • NC Data
Project Type
  • Government
Year

2023